Thursday, March 17, 2022

To the Manor Born ~ 3

A little more progress on the fortified manor build.

The half-timbered gatehouse is more or less complete. I'm debating whether to leave the windows as-is (glazed) or have them shuttered. 

My take on this build is that the manor was more heavily fortified at one time but the owner's desire for comfort led to certain modifications over the past few years. The gatehouse was rebuilt when a modest tower gave way to more living accommodation. With this update the original gate became offset beneath the structure. I'll add traces of the original tower in the wall.

The roof won't take that much work. I'm thinking of painting the tiles or using a railway modelling print rather than go to the effort of making individual tiles.

A side view showing how narrow the profile is. It won't take up a large footprint on the table. (The sides of the gatehouse will be covered to hide the evidence that I'm making some of this up as I go along!) The perimeter walls either side will be bent back to the same level as the rear of the structure then the whole mounted on a narrow base. I will add some detailing to the front, and may add a tower in outline form to the right hand wall to represent further defences along the wall.

This build is in the final stages. I have another project on the go at the moment, hinted at by the structure to the left of the bottom photo.


1 comment:

Peter said...

the semi-flat building is coming along nicely.

 

home page uniques